Network Infrastructure // Structured Cabling
Best for new offices, renovations, and retrofits

Cabling done once, certified, lasts a decade.

Bad cabling is invisible until it isn't. Intermittent disconnects, slow video calls, that one desk that 'never works.' Then you're paying twice — once to install, once to redo. We run cabling that's tested, certified, labeled, and warrantied — first time.

25+ years
Typical Cat 6A cable lifespan when installed and certified properly
Engineer installing structured cabling
fig.01
London
Delivered locally across the Southwestern Ontario. PHIPA & SOC 2 Type II Auditing Frameworks Aligned.
4-Hour On-Site Dispatch
Their fractional CTO consulting helped us rebuild our legacy applications into high-availability cloud platforms. Excellent communication and regional execution.
Rebecca Sterling, Sterling Mutual Assurance
Sound familiar?

What goes wrong with bad cabling.

pain 01

Desk 14 has intermittent disconnects.

Cable was pulled around a sharp corner. Damaged but functional. Until it isn't.

pain 02

Video calls choke on the 4th floor.

Riser cable couldn't keep up. Was OK in 2018 with 100 Mbps. Not in 2026 with 10 Gbps backbones.

pain 03

Patch panel is unlabeled spaghetti.

Need to move a desk. Three hours tracing which cable goes where.

pain 04

Lowest-bidder install, no certification.

Looks neat. Performs poorly. No way to prove the cable itself is at fault. Nobody owns the problem.

What you get

What we deliver.

  • 01

    Site survey + drawings

    Floor plan reviewed. Route every cable will take. Drop counts per desk, conference room, and AP location.

  • 02

    Cat 6A copper to every drop

    Future-proof for 10 Gbps. Tested and certified to TIA-568 standards.

  • 03

    Fibre backbone

    Single-mode or OM4 between floors and to the comms room. Sized for 25 Gbps + future growth.

  • 04

    Labeling + documentation

    Every drop labeled at both ends. Patch panel map produced. Drawings updated to as-built.

  • 05

    Fluke certification

    Every drop tested with a Fluke certifier. Results delivered as PDF.

  • 06

    Manufacturer warranty

    25-year warranty from Panduit, CommScope, or Belden. Survives the building lease.

Compare

Where shortcuts show up later.

What lowest-bidder cabling looks like vs. what holds up.

Lowest bidMid-rangeSenator certified
Cable categoryCat 5e or unlabeledCat 6Cat 6A
Future-proof for 10 GbpsNoSometimesYes
CertificationNoneSometimesEvery drop, Fluke certified
Manufacturer warrantyNoneLimited25 years
DocumentationNone or basicSpreadsheetDrawings + patch map + cert PDF
Pulling disciplineRushedOKPer spec — bend radius, tension, separation
Likely re-pull within 5 yearsHighMediumNear zero
Built on

Cabling components.

Cable
Panduit Cat 6ACommScope Cat 6ABelden Cat 6AOM4 + single-mode fibre
Termination
Panduit jacks + patch panelsCommScope SYSTIMAXLeviton
Testing
Fluke DSX-8000 (copper)Fluke OptiFiber (fibre)
By the numbers

What we deliver.

100
%
Drops certified

Every cable tested. Failures fixed before sign-off.

25
yr
Manufacturer warranty

Standard with our certified installations.

0
Re-pull jobs

Within 5 years of a Senator install. Track record speaks for itself.

<2
%
Drops failing certification

On first pass. Fixed and re-tested before handover.

From a client
We had three different cabling installs by previous tenants. None labeled, none documented, half failing. Senator pulled fresh Cat 6A to every desk, labeled everything, gave us a binder of test results. When auditors asked about infrastructure, we handed them the binder.
Facilities Director · 60-person law firm · Bay Street, Toronto
Who needs this

Who needs this.

  • Anyone moving into a new space (cabling is the first thing in, last thing out).
  • Firms renovating that includes adding desks, conference rooms, or AP locations.
  • Acquired offices with undocumented cabling chaos.
  • Multi-tenant buildings where the base building's cabling is unreliable or shared.
FAQ
Q01

How long does a typical install take?

30-seat office: 5–8 business days for cable pull + termination + certification. Larger or multi-floor jobs scale linearly.

Q02

Can you work in occupied space?

Yes — most of our work is after-hours and weekends in occupied offices. Phased so nobody's desk is offline for more than a few hours.

Q03

What about cabling for security cameras / access control?

Yes — we run PoE-rated cabling for IP cameras, badge readers, and door controllers. Often during the same install.

Q04

Do you handle fibre between sites?

Yes — if right-of-way exists. Often coordinated with landlord and city for buried runs.

Next step

Free site walk + scope.

Send us your floor plan and timeline. We walk the space, scope the cabling, and send a fixed-price proposal in 5 business days.